Specialist construction

Destia Oy

2024–2025 | Sheet piling
Steel sheet piling at Oulu Torinranta

GRK Suomi Oy

2024 | Work bridge
Hailuoto temporary bridge, 700 metres, 20 000 pile metres

NCC AB

2019–2022 | Sheet piling, pipe piling
OYS 2030 -project, sheet piling, anchoring, and drilled pipe piling

Stora Enso Oyj

2023–2024 | Sheet piling
Stora Enso Oulu, driven and drilled pipe piling

Rakennusliike Lapti Oy

2024–2026 | Sheet piling and anchoring
Oulu Osuuspankki, sheet piling and anchoring

Earthworks

Rakennusliike Lapti Oy

2024–2026 | Groundworks
Oulu Osuuspankki, demolition of an old building, excavation supports, digging, quarrying, bedrock reinforcement, filling and piping

Fortum Oyj

2025 | Earthworks in a new build
Loviisa accommodation village, earthworks and plumbing works in buildings, and traffic areas 20 000 m²

Hartela Oy

2025–2026 | Groundworks
Sokos Hotel Ruka Break, demolition of an old building, excavation support, digging, quarrying, bedrock reinforcement, filling and piping

Kemin kaupunki

2020 | Earthworks in a new build
Sauvosaari sports field, mass transfer, load-bearing earth structures, piping and yard structures

Metsä Group

2019–2023 | Industrial construction
Metsä Fibre bioproduct factory, sheet piling, excavation work as a building foundation, mass replacement, load-bearing earth structures, piping, yard structures and landscaping

Demolition and recycling services

Fennovoima Oy

2024–2025 | Demolition work
Fennovoima Pyhäjoki, nuclear power plant site demolition work, 70 000 m²

Fortum Oyj

2025 | Demolition work
Loviisa, demolition of the old accommodation village, 7000 m²

Rave Rakennus Oy

2024–2025 | Demolition work
Demolition of Oulu Kangastie

NCC AB

2025–2026 | Demolition work
OYS 2030 -project, old hospital demolition, 40 000 m²

Rakennusliike Lapti Oy

2024 | Demolition work
Oulu Osuuspankki old building demolition

Energy construction

Fortum Oyj

2025 | Plumbing and transformer stations
Loviisa accommodation village municipal and water supply works and two 1000kVa transformers

Simon hakeosuuskunta

2024 | MEP works and solar panels
MEP works for new 500 kW wood chip heating plant and 43kWp solar panels

Fire station (Utsjoki & Kolari)

2024–2025 | Geothermal system
Complete geothermal heat deliveries and other MEP work

As Oy Tornion itäranta

2023 | Electrical renovation
Electrical renovation of a 63-apartment apartment building and electric car charging points

Biltema Suomi Oy / Steelmont

2024 | Geothermal system
Kemin Biltema, geothermal drilling (24pcs * 320m) and main line installations